CASIAS CONSTRUCTION LLC

Quality is our top priority.

Casias Construction LLC takes great pride in it’s completed projects.  Below are just a few examples of our successful projects.

The Haven for Hope project was one of the most high profile projects in San Antonio.  This campus provides a place for the homeless of San Antonio to receive shelter, nourishment, medical care, and training that will enable them to return to society in a productive manner.  Zachry Construction Corporation served as the General Contractor/Construction Manager for the entire campus.  Casias Construction LLC was the General Contractor for the food service/indoor prospects facility for the campus.    The facility contains a kitchen, dining area, showers and a locker area, restrooms, offices and a chapel.  The most challenging aspect of this project was the existing conditions that were encountered.   This project was 41,000 SF of renovations to a building that was built over 50-years ago. 

Haven for Hope Food Service / Indoor Prospects Facility

Projects

The Lanier High School Wellness Center was constructed for the San Antonio I.S.D. and is one of the most state of the art complexes in San Antonio.  The facility contains a basketball and volleyball gymnasium, a wellness center that can be utilized by the public, locker rooms, shower areas, offices, and a concession area.  Immediately upon completion, this facility was utilized to host the Stars of Texas Basketball Tournament in which many of the best athletes in the country participated.    This project site was located between the existing library and the existing practice football field/track.  As school was in session for most of construction, the safety of the students and staff were extremely critical.

Lanier High School Wellness Center—SAISD

This project consisted of both new construction and renovation work.  The new construction included one fully enclosed gymnasium and five open air pavilions.  The renovation work included the addition of HVAC systems to existing gymnasiums.  This project was challenging due to logistics.  The work took place on six different campuses located in three different cities.   During the course of construction, Casias Construction LLC utilized very little of the contingency fund for the project, so the district added playground equipment for ten different campuses to our scope of work. 

SCUCISD Elementary Schools Gym Additions / Renovations

Casias Construction LLC completed our first waterslide for Sea World of Texas in 2008.  As with all projects at Sea World schedule is of the upmost performance, and this project was no different.  Over a period of about four months the bare site was transformed into fully functional water ride, just in time for the 4th of July weekend.  Based upon our previous performance, we were awarded the second slide project in 2010, which added two more slides to the attraction.

Sea World Water Slides 2008 and 2010

This was the second project for the U.S. Army Corps of Engineers that Casias Construction LLC has done.  It consisted of the complete demolition and renovation of one wing of the second floor, Building 2 at the Sam Rayburn Memorial Veterans’ Center in Bonham, TX.  The project consisted of completely new plumbing, HVAC and electrical systems; as well as, all new interior finishes.  The completed facility includes new restrooms, private offices, an open office area, a break room and a conference / training room.

Renovations—Sam Rayburn Memorial Veterans’ Center

This project is an interior finish-out of a concession space located in the new Terminal B at San Antonio International Airport.  It includes a front sales counter, food prep areas, a walk-in cooler/freezer and a small office.

Charley’s Grilled Subs—San Antonio International Airport Terminal B

CASIAS CONSTRUCTION LLC

Quality is our top priority.